S

Syntec

Workspace

Same PIN as the technical desk.

SSyntec Workspace
Ask Claudia

Pick a sheet on the left, or upload a plan set under Docs.

Documents

Send the roofing spec and the roof plan first — they answer the most per page. Structural notes settle whether the deck is sloped; the mechanical and plumbing roof plans are the authoritative equipment and drain counts. Screenshots are welcome and often faster than a whole set.

Choose files or drop them here
PDF, DWG, DXF, ZIP or images · up to 20 files

In this project

Roof evaluation

Reads the documents and works out what this roof is, slot by slot, with the page every value came from. A slot nobody could source stays open with a question — and tells you where to look, what it looks like on the sheet, and what a normal answer is.

Take-off assist

Every condition the documents and the plan say this roof probably has. Measured comes off your trace or a measurement taken on the sheet, documented carries the page it was found on, and expected is on nearly every roof so it has to be ruled out on purpose. Verify each line.

scale: not calibrated 100%